Moving GRE T-Pieces to another spot


Step 1: Cutting and Drain the Pipes

  • Cut and drain the pipes to prepare for the removal of the T-pieces.

Step 2: Removing and Reinstalling T-Pieces

  • Remove the T-pieces from their current positions.
  • Install the T-pieces in the new designated locations.

Step 3: Connecting the Piping

  • Connect the piping to the new T-piece positions.

Step 4: Closing the Gaps

  • Close the gaps left by the removed T-pieces by laminating the new straight pipe sections.

After completing the installation, the work area was thoroughly cleaned. The pipes were then pressure tested, and no issues were detected, ensuring the integrity and reliability of the system.